SIZE
               shoe size 38
               DIMENSIONS WHEN COMPLETED
               Shoe size 37-41
               Circumference at calf approx. 34(38)42 cm
               DEMAND
               Novita 7 Veljestä (010) Off White 300 g
               OTHER SUPPLIES
               Double-pointed needles:
               Novita 3½ mm or the size needed to obtain correct gauge or
               Circular needles (100 cm):
               Novita 3½ mm or the size needed to obtain correct gau
ge
             DENSITY
             Gauge
             21 sts in stockinette stitch = 10 cm
 
Day 1

If you are using double-pointed needles, cast on 56(64)72 sts and distribute them

evenly onto four needles. The beginning of the round is between needles I and IV.

If you are using the Magic Loop technique, cast on 56(64)72 sts onto the circular

needle for the 1st sock and, from another ball of yarn, cast on another 56(64)72 sts onto the same needle for the 2nd sock. Divide the sts for the 1st sock into two groups by pulling a loop of cable

from between the middle two sts. Do the same for the 2nd sock.

Purl 1 round and begin the lace pattern from row 1 of chart:

Row 1: *Slip 1 st onto the right-hand needle, k2 and pass the slipped st over these

2 sts removing it from the needle. P1, k1 through the back loop (=tbl), p1, k1tbl, p1*, repeat *–* for a total of 7(8)9 times.

Row 2: *K1, make a yarn over, k1, p1, k1tbl, p1, k1tbl, p1*, repeat *–* for a total of

7(8)9 times.

Row 3: *k3, p1, k1tbl, p1, k1tbl, p1*, repeat *–* for a total of 7(8)9 times.

Row 4: Work as you did on row 3.

Repeat rows 1–4 of the chart for 4 times in total. Work row 1 once more. 7(8)9

sts decreased on the last row, 49(56)63 sts on the needles.

Day 2

Knit 1 round and then purl 1 round. Knit the next round and at the same time

evenly increase 3(4)5 sts = 52(60)68 sts. *K1, make the bobble (= knit the same

st 3 times, first through the front loop, then through the back loop and then through

the front loop again). Turn work, p3, turn work, k2, slip the 2nd stitch on the right-hand needle over the 1st st, k1 and again slip the 2nd st over this st, k2*. Repeat *–* for a total of 13(15)17 times. Knit 1

round, purl 1 round, knit 1 round. *K3, make the bobble*. Repeat *–* for a total of

13(15)17 times. Knit 1 round, purl 1 round.

Day 3

Knit 1 round and at the same times increase 0(2)4 sts = 52(62)72 sts. Purl 2 rounds. Continue working from row 1 of the chart:

Row 1: P1, follow the chart: *p1, p2tog, knit the next st twice (first through the back loop and then through the front loop), p3, knit the next st twice, p2tog*. Repeat *–* for a total of 5(6)7 times and then p1.

Row 2: P1. *P1, k2tog, make a double yarn over, work the skp decrease (= slip 1, knit 1, pass the slipped st over), p1, k2tog, double yarn over, skp*. Repeat *–* for a total of 5(6)7 times and then p1.

Row 3: P1. *P1, k1, knit the 1st yarn over, purl the 2nd yarn over, k1, p1, k1, purl the 1st yarn over, knit the 2nd yarn over, k1*. Repeat *–* 5(6)7 times in total and then p1.

Row 4: P1. *P1, k3, yo, k3tog (sl1 st knitwise, k2tog, pass the slipped st over) , yo, k3*. Repeat *–* 5(6)7 times in total  and then p1.

Day 4

Continue the pattern from row 1 of chart:

Row 1: P1. Work following the chart: *p1, k9*. Repeat *–* 5(6)7 times in total and then p1.

Row 2: P1. *P1, yo, k3, k3tog (= sl1 st knitwise, k2tog, pass the slipped st over) , k3, yo*. Repeat *–* 5(6)7 times in total and then p1.

Row 3: P1. *P1, p1 through the back loop (=tbl), k7, p1tbl*. Repeat *–* 5(6)7 times in total and then p1.

Row 4: P1. *P2, yo, k2, k3tog, k2, yo, p1*. Repeat *–* 5(6)7 times in total, p1.

Row 5: P1. *P2, p1tbl, k5, p1tbl, p1*. Repeat *–* 5(6)7 times in total, p1.

Row 6: P1. *P3, yo, k1, k3tog, k1, yo, p2*. Repeat *–* 5(6)7 times in total, p1.

Row 7: P1. *P3, p1tbl, yo, k3tog, yo, p1tbl, p2*. Repeat *–* 5(6)7 times in total, p1.

Row 8: P1. *P4, p1tbl, p1, p1tbl, p3*. Repeat *–* 5(6)7 times in total, p1.

Day 5

Knit 1 round and at the same time decrease 2 sts = 50(60)70 sts.

Row 1: *Slip 1 st and at the same time make a yarn over  (=sl 1 yo), p1*. Repeat *–* 25(30)35 times in total.

Row 2: *Knit the st together with its yarn over, slip 1 yo*. Repeat *–* 25(30)35 times in total.

Row 3: *Slip 1 yo, purl the st together with its yarn over*. Repeat *–* 25(30)35 times in total.

Row 4: Work as you did on row 2.

Row 5: Work as you did on row 3.

Row 6: Work as you did on row 2.

Knit 1 round (knit the st together with its yarn over) =50(60)70 s.

Day 6, 7 and 8

If you are using double pointed needles, distribute the sts evenly onto 4 needles: 13, 12, 12 and 13 (15, 15, 15 and 15) 18, 17, 17 and 18 sts.

For the Magic Loop techniqueplace 25(30)35 sts onto needle 1 and 25(30)35 sts onto needle 2 on the 1st sock as well as on the 2nd sock.

Instructions and chart for the double-pointed needles:

 

 

Row 1: Work chart A: k3, skp, k4.
Work chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total and p2(1)0.
Work chart C: p16 and then p2(1)0 and move to chart D: *k1tbl, p2*, repeat *–* for a total of 2(4)6 times. Work chart E: k4, k2tog, k3. 2 sts decreased on this round, 48(58)68 sts on the needles.

Row 2: Chart A: k8. Chart B: *p2, k1bl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p6, make the 5 st bobble (k1, yo, knit the same st again, yo, knit the same st, turn work, k5, turn work, p5. Pass the 2nd, 3rd, 4th and 5th sts over the 1st st), p2, 5 st bobble, p6, p2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 3: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart B: *p2, work a 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd st over the 1st st), p2, k1tbl*,repeat *–* 1(2)3 times in total, p2(1)0.
Chart C: p3, 5 st bobble, p2, k1, p2, k1, p2, 5 st bobble, p3, p2(1)0.
Chart D: *k1tbl, p2, 3 st bobble, p2*,repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1. 2 sts increased, 50(60)70 sts on the needles.

Row 4: Chart A: k9. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p3, k1, p2, k1, p2, k1, p2, k1, p3, p2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.

Row 5: Chart A: k3, skp, k4. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, 5 st bobble, p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, move 1 st to the right (place 1 st in back of the work, k1, purl the st in back),p1, move 1 st to the right, p1, 5 st bobble, p1, p2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k4, k2tog, k3. 2 sts decreased, 48(58)68 sts on the needles.

Row 6: Chart A: k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, k1, p2, k1, p2, k2, p2, k1, p2, k1, p1. P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 7: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold). Chart B: * p2, k1tbl, p2, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st)*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, p1, k2, p1, move 1 st to the right (place 1 st in back of the work, k1, purl the st in back), p1, move 1 st to the right, p1.
P2(1)0. Chart D: * 3 st bobble, p2, k1tbl, p2, *, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
2 sts increased, 50(60)70 sts on the needles.

Row 8: Chart A: k9. Chart B: *2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, k1, p2, move 1 st to the left, k2, move 1 st to the right, p2, k1, p2. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.

Row 9: Chart A: k3, skp, k4.
Chart B: *p2, k1tbl,*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, move 1 st to the left, p2, move 1 st to the left, move 1 st to the right, p2, move 1 st to the right, p2.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k4, k2tog, k3. 2 sts decreased, 48(58)68 sts on the needles.

Row 10: Chart A. k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p3, move 1 st to the left, p2, k2, p2, move 1 st to the right, p3.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k8.

Row 11: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart B: * p2, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2, k1tbl *, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p4, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p4.
P2(1)0. Chart D: *k1tbl, p2, 3 st bobble, p2*, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1. 2 sts increased, 50(60)70 sts on the needles.

Row 12: Chart A: k9. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2tog, p3, move 1 st to the left, k2, move 1 st to the right, p3, p2tog.
P2(1)0. Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k9.
2 sts decreased, 48(58)68 sts on the needles.

Row 13: Chart A: k3, skp, k4.
Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total. P2(1)0.
Chart C: p5, move 1 st to the left, move 1 st to the right, p5. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total. Chart E: k4, k2tog, k3.
2 sts decreased, 46(56)66 sts on the needles.

Row 14: Chart A: k8. Chart B: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p6, k2, p6. P2(1)0.
Chart D: *k1tbl, p2*, repeat *–* 2(4)6 times in total.
Chart E: k8.

Row 15: Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left.
Chart B: *p2, k1tbl, p2, 3 st bobble *, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p2tog, p4, k2, p4, p2tog.
P2(1)0. Chart D: *3 st bobble, p2, k1tbl, p2*, repeat *–* 1(2)3 times in total.
Chart E: 4 st cable turn to the right, k2tog, yo, k1, yo, k1.
46(56)66 sts on the needles.

Instructions and chart for the Magic Loop technique:

 

Row 1:  Size XS/S - (size k1bl, p1) size k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p16, p2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round. 2 sts decreased, 48(58)68 sts on the needles.

Row 2: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k8.
Chart A: k8. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p6, 5 st bobble (knit, yo, knit the same st again, yo, knit the same st, turn work, k5, turn work, p5. Pass the 2nd, 3rd, 4th and 5th sts over the 1st st), p2, 5 st bobble, p6, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 3: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, 3 st bobble, p2, k1tbl*, repeat *–* 1(2)3 times in total, p2(1)0.
Chart C: p3, 5 st bobble, p2, k1, p2, k1, p2, 5 st bobble, p3, p2(1)0. Chart F: *k1tbl, p2, 3 st bobble, p2*,repeat *–* to end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 4: Size XS/X - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k9. Chart A: k9.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p3, k1, p2, k1, p2, k1, p2, k1, p3, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 5: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total, p2(1)0.
Chart C: p1, 5 st bobble, p1, move 1 st to the left (hold 1 st in front, p1, knit the st on hold), p1, move 1 st to the left, move 1 st to the right (hold 1 st in back, k1, purl the st on hold),  p1, move 1 st to the right, p1, 5 st bobble, p1, p2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round. 2 sts decreased, 48(58)68 sts on the needles.

Row 6: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k8. Chart A: k8:
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p1, k1, p2, k1, p2, k2, p2, k1, p2, k1, p1.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 7: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, k1tbl, p2, 3 st bobble*, repeat *–* 1(2)3 times in total. P2(1)0.
Chart C: p1, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, move 1 st to the left, p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p1, move 1 st to the right, p1. P2(1)0.
Chart F: *3 st bobble, p2, k1tbl, p2*, repeat *–* to end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 8: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k9. Chart A: k9. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2, k1, p2, move 1 st to the left, k2, move 1 st to the rigt, p2, k1, p2.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 9: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k4, k2tog, k3. Chart A: k3, skp, k4.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total. P2(1)0.
Chart C: p2, move 1 st to the left, p2, move 1 st to the left, move 1 st to the right, p2, move 1 st to the right, p2.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 48(58)68 sts on the needles.

Row 10: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k8. Chart A: k8. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p3, move 1 st to the left, p2, k2, p2, move 1 st to the right, p3. P2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 11: Size XS/S - (Size M k1tbl, p1) Size L 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2, k1tbl, p1.
Move on to chart B: p1, 3 st bobble (knit the st through the front loop, through the back loop and again through the front loop, pass the 2nd and 3rd sts over the 1st st), p2.
Chart E: 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold), k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold).
Chart D: *p2, 3 st bobble, p2, k1tbl*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p4, move 1 st to the left (place 1 st in front of the work, p1, knit the st in front), p1, k2, p1, move 1 st to the right (hold 1 st in back, k1, purl the st on hold), p4.
P2(1)0. Chart F: *k1tbl, p2, 3 st bobble, p2*, repeat *–* to the end of round.
2 sts increased, 50(60)70 sts on the needles.

Row 12: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.

Move on to chart B: p1, k1tbl, p2.
Chart E: k9. Chart A: k9.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p2tog, p3, move 1 st to the left, k2, move 1 st to the right, p3, p2tog.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 48(58)68 sts on the needles.

Row 13: Size XS/S - (Size M k1tbl, p1) Size L k1tbl, p2, k1tbl, p1.
Move on to chart B: p1, k1tbl, p2. Chart E: k4, k2tog, k3.
Chart A: k3, skp, k4. Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p5, move 1 st to the left, move 1 st to the right, p5.
P2(1)0. Chart F: *k1tbl, p2*, repeat *–* to end of round.
2 sts decreased, 46(56)66 sts on the needles.

Row 14: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.
Move on to chart B: p1, k1tbl, p2.
Chart E: k8. Chart A: k8.
Chart D: *p2, k1tbl*, repeat *–* 2(4)6 times in total.
P2(1)0. Chart C: p6, k2, p6. P2(1)0.
Chart F: *k1tbl, p2*, repeat *–* to end of round.

Row 15: Size XS/S - (Size M 3 st bobble, p1) Size L k1tbl, p2, 3 st bobble, p1.

Move on to chart B: p1, k1tbl, p2.
Chart E: 4 st cable turn to the right, k2tog, yo, k1, yo, k1.
Chart A: k1, yo, k1, yo, skp, 4 st cable turn to the left.
Chart D: *p2, k1tbl, p2, 3 st bobble*, repeat *–* 1(2)3 times in total.
P2(1)0. Chart C: p2tog, p4, k2, p4, p2tog.
P2(1)0. Chart F: *3 st bobble, p2, k1tbl, p2*, repeat *–* to end of round.

46(56)66 sts on the needles.

 

Day 9

Knit 1 round, purl 1 round and at the same time evenly increase 10(8)6 sts = 56(64)72 sts.

Work following instructions and the chart.

Row 1: 4 st cable turn to the left (hold 2 sts in front, k2, knit the 2 sts on hold), 4 st cable turn to the right (hold 2 sts in back, k2, knit the 2 sts on hold). Repeat 7(8)9 times in total.

Rows 2–4: knit all sts.

Row 5: 4 st cable turn to the right, 4 st cable turn to the left. Repeat 7(8)9 times in total.

Rows 6–8: knit all sts.

Works rows 1 and 2 once more.

 

Day 10

Purl 1 round and at the same time evenly decrease 4(8)12 sts = 52(56)60 sts.

Double-pointed needles: Work following instructions and  the chart.

 

Row 1: [Chart A: p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp (=slip 1, knit 1, pass the slipped st over), repeat *–* 2 times, k1.

Size XS/S - (Size M p1, k1) Size L p1, k1, p1, k1.

Chart B: *p1, k1*, repeat *–* 3 times in total. K2tog, repeat *–* 2 times, yo, k1].

Repeat  [2 times in total.

Row 2: [Chart A: p1, k2, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1, p1, k1. Then: Size XS/S - (Size M/L p1, k1) Size XL p1, k1, p1, k1. Move on to chart B: *p1, k1*, repeat *–* 2 times in total, p1, k2tog, repeat *–* 2 times, yo, k2].

Repeat [2 times in total.

Row 3: [Chart A: p1, k2, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1, p1, k1. Then: Size XS/S - (Size M/L p1, k1) Size XL p1, k1, p1, k1. Move on to chart B: *p1, k1*, repeat *–* 2 times in total, k2tog, repeat *–* 2 times, yo, p1, k2].

Repeat [] 2 times in total.

Row 4: [Chart A: p1, k2, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1. Then: Size XS/S - (Size M/L p1, k1) Size XL p1, k1, p1, k1. Move on to chart B: p1, k1, p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k2].

Repeat [] 2 times in total.

Row 5: [Chart A: p1, k2, p1, k1, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1. Then: Size XS/S - (Size M/L p1, k1) Size XL p1, k1, p1, k1. Move on to chart B: p1, k1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, p1, k1, p1, k2].

Repeat [] 2 times in total.

Row 6: [Chart A: p1, k2, p1, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp. Then: Size XS/S - (Size M/L p1, k1) Size XL p1, k1, p1, k1. Move on to chart B: p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k1, p1, k2].

Repeat [] 2 times in total.

Work rows 1-6 once more.

 

Magic Loop technique:  Work following instructions and  the chart.

Row 1: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 3 times in total, k2tog, repeat *–* 2 times, yo, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp (= slip 1, knit 1, pass the slipped st over), repeat *–* 2 times, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 2: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 2 times in total, p1, k2tog, repeat *–* 2 times, yo, k2, p1, k2, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, repeat *–* once, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 3: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, repeat *–* 2 times in total, k2tog, repeat *–* 2 times, yo, p1, k2, p1, k2, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1, p1, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [–] 2 times in total.

Row 4: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, p1, k2tog, repeat *–* 2 times, yo, k1, p1, k2, p1, k2, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp, p1, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 5: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: *p1, k1*, k2tog, repeat *–* 2 times, yo, p1, k1, p1, k2, p1, k2, p1, k1, p1, yo, *k1, p1*, repeat *–* 2 times in total, skp, k1.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Row 6: [Size XS/S - (Size M k1) Size L p1, k1.

Work following the chart: p1, k2tog, *p1, k1*, repeat *–* 2 times in total, yo, k1, p1, k1, p1, k2, p1, k2, p1, k1, p1, k1, yo, *k1, p1*, repeat *–* 2 times in total, skp.

Size XS/S - (Size M p1) Size L p1, k1].

Repeat [] 2 times in total.

Work rows 1–6 once more.

Day 11

Knit 1 round and at the same time evenly decrease 2(4)8 sts:

Double-pointed needles: